Crawler Pipelayer

Crawler Pipelayer

Crawler Pipelayer
Model:DGY15
Pilot Control
Max Lifting Capacity:15,000.00kg
Engine:Weichai WD10G/Weichai WP10G
Operating Weight:19,700.00kg
Send Inquiry
Product Introduction

DGY15 Pipe Laying Machine Core Advantages

 

The DGY15 crawler-type pipe laying machine (15-ton class) is specifically designed for complex working conditions such as oil and gas/municipal pipeline laying, mountainous/wetland/Gobi desert environments. Its core advantages are concentrated in five dimensions: lifting performance, chassis reliability, working condition adaptability, cost-effectiveness, and market reputation. It is the mainstay model for small and medium diameter pipeline construction.

 

1. Strong lifting performance and high operating efficiency

 

2. Robust crawler chassis, maximizing passability and stability

 

3. Wide working condition adaptability, all-weather operation, highly interchangeable parts, low maintenance costs, suitable for long-term operation in remote construction sites.

Durable structure and convenient maintenance: Key structural components (boom, chassis, crawler frame) are made of high-strength steel, with welding and heat treatment processes meeting standards, ensuring fatigue and impact resistance; the modular design of the hydraulic and power systems allows for quick replacement of wear parts, reducing operation and maintenance costs and downtime.

 

4. Excellent Cost-Effectiveness and Market Reputation

Significant Cost Advantage: Compared to imported pipe-laying machines of the same tonnage, the purchase price, maintenance costs, and spare parts prices are lower; the machine boasts high reliability, a low failure rate, and a more favorable total life-cycle cost, making it suitable for engineering contractors and leasing companies.

 

5. User-Friendly Operation: The ergonomically optimized cab provides a wide field of vision, and the reasonable layout of the control handles reduces driver fatigue and improves operational safety and efficiency.

 

Main Specification of DGY15 Crawler Pipelayer

 

Liffng Capscity at tipoing point(t)

15.00

Max Lifting moment at min.load overhang(KN.m)

179(147KN*1.22m)

Max Lifting moment at max,load overhang(KN,m)

110(22KN*5.00m)

Boom Length(m)

6.0

Max Lifting height of hook(m)

4.5

Max hoisting speed of hook(4 part line)

10

Boom elevating time(s)

30

Chassis Model

DGY15

Engine

Engine Model

WEICHAI WD10G

Welchai WD10G

WEICHAI WP10G

Welchai WP10G

Rated Power(kw/rpm)

131/1850

133/1850

Track gauge(mm)

1880

Length of track on ground(mm)

2570

Track width{mm)

560

Operating Mode

Hydraulic Pilot Control

Rated working pressure of system(Mpa)

20

Hook winch

Hydraulic driven,Planetary transmission,Free Fall Function

Diameter of lifting wire rope

16

Ranging wich

Hydraulic driven,Planetary transmission

Diameter of Ranging wire rope

14

Temperature of surrounding(optional)(℃)

-40℃~60℃

Overall dimension(L*W"H)

With boom(m)

4.08*5.00*6.75

Without boom/m)

4.25*2.97*3.01

Average Pressure

Without

load(Mpa)

0.067

Operating Weight(kg)

19700.00

 

Specifications are subject to change without prior notice


 

FAQ

Q: What type of hydraulic oil is used in the hydraulic system? Are there any recommendations for high-temperature/tropical regions?

A: Use 46# anti-wear hydraulic oil at room temperature; 68# anti-wear hydraulic oil is recommended for tropical high-temperature environments.

Q: How is the entire machine transported? Can it be disassembled for transport?

A: Standard models are transported as a whole by roll-on/roll-off; extra-large tonnage models can be transported by disassembling the main boom, and then assembled and adjusted upon arrival at the construction site.

 

 

Hot Tags: crawler pipelayer, China crawler pipelayer manufacturers, suppliers, factory

Send Inquiry

whatsapp

Phone

E-mail

Inquiry